See car .. see car with paint

| | Comments (0) | TrackBacks (0)

See the car has paint on it .. well some of it. We are making lots of progress now. Even after all the metal work had been done which took over 6 months, we still are putting many hours in the car to get the body straight. We have over 80 hours into it and may reach 90 after all is said and done. I ran into Cliff ( the body man ) from a mutual friend. After a few discussions and looking at his beautifully restored Healy 3000 we decided to proceed and have him get the car prepped for paint.

I just spent the weekend driving down to LA for the Precision Proformance BBQ. My father was on his way down to LA for his own reason and I tagged along to bring my ZF to Bob and pick up some other parts they had ready for me. I have most of my components for the suspension, including adjustable rear upper a-arms, busing kits, 1" sway bars all the way around, sphere bar sway bar bushings, solid axles, Precision Proformance 3-way adjustable shocks, 700lb rear springs and 450lb front springs, stainless steel bolt kit for suspension, and 4 piston caliper NASCAR brake kit from Precision Proformance. I am sure I am missing things from this list.

cliff1.jpg cliff2.jpg cliff3.jpg cliff4.jpg cliff5.jpg

cliff6.jpg cliff7.jpg

0 TrackBacks

Listed below are links to blogs that reference this entry: See car .. see car with paint.

TrackBack URL for this entry: http://www.grahamjoyce.net/cgi-sys/cgiwrap/brig/managed-mt/mt-tb.cgi/30

Leave a comment

About this Entry

This page contains a single entry by Jason Eaton published on May 20, 2002 9:22 PM.

No money, no wheels was the previous entry in this blog.

Got yellow? is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.